DRG Construction builds and repairs docks on the New York and Florida waterfronts. Timber, composite and aluminum docks, pile-supported and floating systems, with boat lifts, utilities and gangways designed as part of the same project. We work from the water, so canal-front, bayfront and open-water sites are all reachable.
Dock construction
A dock is a structural system, not a platform on posts. Every one we build starts with the same three questions: what the bottom will carry, how much tide and current the site sees, and what the dock has to hold, including the boat, the lift and the people standing on it.
We build:
- Pile-supported docks in treated timber, composite and aluminum, with pile spacing and bracing sized for the load rather than for appearance
- Floating docks for sites with real tide range, where a fixed deck would sit too high or too low through the cycle
- Commercial and multi-slip docks for marinas, restaurants and waterfront businesses, including utility runs, fire access and ADA gangways
- Dock repair and reconstruction, including pile replacement, deck and stringer replacement, and hardware upgrades
Dock pilings: where most dock problems start
In South Florida’s soft bay bottom, a pile relies on reaching a firmer stratum or on being driven deep enough that the surrounding material consolidates. On Long Island’s sand and silt, the same pile carries a different load because the water moves differently. We probe the bottom before design, and we check plumb continuously while driving, because a pile that goes in out of line cannot be corrected later without pulling it.
Piles in salt water also fail at a specific height: right at the waterline, where wetting, drying and oxygen all meet. That is the section we inspect first on an existing dock.
Dock decking and materials
Treated wood is the traditional choice and still the best value in many residential applications, but it moves, it checks, and it needs fastening maintenance. Composite decking avoids splinters and rot and holds color. Aluminum frames suit floating systems and commercial docks where weight and longevity matter. We will tell you which one fits your site and how you use it rather than defaulting to one material for every job. More detail on the parts involved: parts of a dock explained.
Commercial dock construction
Commercial dock construction is a different job from a residential slip. Marinas, restaurants, fuel docks and boat clubs need load capacity for foot traffic and vehicles, fire access and egress, ADA gangways, utility runs for power and water, and a structure that survives being hit by boats rather than only walked on. We build commercial docks in aluminum, composite and treated timber over steel or timber pile, and we size the deck framing for the loads the site actually sees rather than a residential span table. Structural connections, guard geometry and float stability are detailed to the county and coastal construction standards that apply, which matters when the dock is part of a permitted commercial operation.
Boat dock construction: what decides the design
Boat dock construction comes down to three site conditions. Depth at low tide decides whether a fixed dock can work or whether you need floating construction that follows the tide. The bottom decides the pile: driven timber or steel in firm sand, longer piles with larger embedment in soft bay mud, and augered or helical systems where driving is not possible. Exposure decides the framing and hardware: brackish canal water and open bay water attack fasteners and connectors at completely different rates. Add the vessel, the lift and how the dock is used, and the layout follows.
Bulkhead and dock construction together
Most bulkhead and dock construction on canal-front property is one project, not two. The wall holds the upland; the dock loads the water side; both bear on the same bank and often the same piles. Designed separately they fight each other, and the wall starts moving where the dock ties in. We set the wall line, the pile layout and the tieback locations in one pass. For the shoreline side, see marine bulkhead and seawall construction.
Docks, boat lifts and seawalls as one project
Most waterfront work we do is combined. A new dock usually means a lift, and often means a wall that is also due. Building them together lets us design the pile layout once: see boat lift installation, floating dock construction, deck construction and repair, marine bulkhead and seawall construction and pier construction.
What dock construction involves on the permitting side
New York: US Army Corps of Engineers authorization, NYSDEC permits under tidal wetlands and Protection of Waters rules, and town or village waterways permits, with county involvement depending on the parcel.
Florida: US Army Corps of Engineers authorization, a Florida DEP environmental resource permit, and county or city approval (Broward EPD, Miami-Dade DERM, Palm Beach County ERM, Lee or Collier County). Seagrass and manatee protections frequently set the work window.
We handle that process, and we check what the parcel’s existing permit allows before designing, because an unpermitted dock or lift becomes a problem at resale.
Where we build docks
New York: Long Island, Nassau County, Suffolk County, New York City, the Bronx and Staten Island.
Florida: Palm Beach County, Broward County, Miami-Dade, the Treasure Coast and South Florida.
Get a dock construction quote
Tell us the water depth at low tide, the boat you keep and what the dock has to do. Call (516) 415-7774 for New York or (772) 418-6400 for Florida, or request an on-site visit.